With a view to optimally utilise limited Uranium reserves and large Thorium reserves in the country, the Department of Atomic Energy has adopted a three-stage nuclear power programme, based on a closed nuclear fuel cycle, for the generation of nuclear power and for achieving long term energy security. The three-stage nuclear power program, which is to be implemented sequentially, aims to multiply the domestically available fissile resources through the use of natural Uranium in Pressurised Heavy Water Reactors (first stage), followed by use of Plutonium obtained from the spent fuel of Pressurised Heavy Water Reactors in Fast Breeder Reactors, in the second stage. Large scale use of Thorium, in the third stage, will subsequently follow making use of Uranium-233 that will be bred in Fast Breeder Reactors, when adequate nuclear-installed capacity in the country has been achieved.

The first stage comprising of Uranium fuelled Pressurised Heavy Water Reactors (PHWR) has reached commercial maturity and presently there are eighteen (18) PHWRs in operation and six (6) under construction. Another ten (10) PHWRs have been sanctioned to be implemented in fleet mode.

After the development of FBR technologies, using Plutonium as fuel, a Fast Breeder Test Reactor (FBTR) is in operation since 1985 and has helped to study all the technologies including fuel and materials for large power FBRs. As a result, a 500 MWe Prototype Fast Breeder Reactor is under the initial stage of commissioning. Indigenous technology development is continuing for larger power – FBRs with high breeding ratio.

With these reactors, it would be possible to produce more fissile material than consumed, leading to large scale deployment, to supply energy to the country for a long time. On account of non-existence of any fissile isotope in naturally occurring Thorium (unlike that existing in Uranium), commercial utilisation of Thorium, on a significant scale, can begin only when an abundant supply of either Uranium-233 or Plutonium resources are available. Accordingly, the utilisation of Thorium as a practically inexhaustible energy source has been contemplated during the third stage of the Indian nuclear programme. Upon the launch, followed by the significant growth of a Thorium based nuclear programme in this manner, it could be possible to maintain the achieved level of nuclear power programme with Thorium alone, without additional demands on Uranium or Plutonium resources. The timeline for the second and third stage depends on breeding ratio achieved during second stage and reactors designed for the third stage and their subsequent deployment scenario.

The above answer was provided in parliament by THE MINISTER OF STATE FOR PERSONNEL, PUBLIC GRIEVANCES & PENSIONS AND PRIME MINISTER’S OFFICE (Dr. JITENDRA SINGH)

Author Profile

Mritunjay Sharma
Mritunjay Sharma
Mritunjay Sharma finished his B.Sc (H) from Kirori Mal College, Delhi University in Chemistry. After that he went to England to study Masters in Polymer Material Science and Engineering from University of Manchester and consequently finished his PhD in Nuclear and Materials Chemistry from University of Manchester
0
0
Tags:

We love hearing from you! You can also reply anonymously skipping the details!

%d bloggers like this: